Commercial

Sandy Factory, Commercial Refurbishment

27th January 2025


Complete refurb of a 31,170 sqft factory unit in Sandy, Bedfordshire.

Project Overview

Gilbert & Gregson were appointed to undertake a comprehensive refurbishment of a 31,170 sq ft factory unit. The client required a full-scale transformation of the facility to modern standards, with a strict 12-week deadline that was critical to operational continuity.

Scope of Works

The refurbishment encompassed both structural and interior upgrades, including:

  • Roof Replacement: Complete removal and installation of a new roofing system to improve insulation and weatherproofing.
  • Roller Shutter Doors: Removal of existing units and installation of modern, secure roller shutters to enhance access and security.

Interior Strip-Out:

    • 20 office spaces
    • Toilets and bathroom facilities
    • Laboratory
    • Reception area

Interior Fit-Out:

  • New flooring throughout
  • Suspended ceilings
  • Electrical rewiring and lighting installation
  • Full decoration and finishing works

Timeline & Delivery

Time was a critical factor for the client, with operations scheduled to resume immediately after project completion. Gilbert & Gregson demonstrated exceptional project management and coordination, completing the entire refurbishment within the 12-week timeframe, without compromising on quality or safety.

Outcome

The refurbished factory unit was delivered on time and to specification, providing the client with a modern, functional, and aesthetically upgraded facility. The success of the project reinforced Gilbert & Gregson’s reputation for reliability, precision, and high-quality execution under pressure.

 